Skip to content
Verde Solaire

College in Greater Noida: 35 kW (2019)

Verde Solaire installed a 35 kW rooftop solar system at a college in Greater Noida in 2019. The college reports that the system is working very well and has delivered substantial savings on its electricity bill.

At a glance

  • Capacity: 35 kW
  • Place: Greater Noida, Uttar Pradesh
  • Type: a college, so an institutional connection rather than a household
  • Installed: 2019
  • Status, in the customer's words: working very well, with a lower electricity bill for the college
Rows of solar panels on tilted frames across a flat concrete roof, with a parapet wall, water tanks, trees and two transmission towers behind them under an overcast sky.
The 35 kW rooftop array at the Greater Noida college.

What the customer wrote

Mr. Sharma adds: "We recommend them highly for installation of solar plant." The feedback reflects a system that has been operating since 2019.

Why a college roof suits solar

A college draws most of its electricity in daylight: classrooms, laboratories, fans, lights and computer rooms run between morning and late afternoon, which is when the panels generate. A home, by contrast, uses much of its power in the evening and depends on net metering to bank the daytime surplus. An institution therefore uses a larger share of its own generation directly, and its case rests on payback rather than on subsidy.

The PM Surya Ghar: Muft Bijli Yojana subsidy does not apply. Its eligibility is an Indian citizen who owns a house with a suitable roof, has a valid electricity connection and has not taken an earlier solar subsidy, which rules out an institution. A college in Greater Noida instead compares the units it would stop buying against the price of the plant; the commercial payback model does that arithmetic for any capacity and tariff.

Net metering in Greater Noida

Greater Noida and Greater Noida West are served by NPCL (Noida Power Company Limited). Noida city is served by a different licensee, PVVNL, and the two have different portals, so the name on the bill decides which process applies.

The documents, stages and timelines for an NPCL application are on the Greater Noida net-metering page. Verde Solaire files the application and follows the meter through to activation as part of an installation, as the Greater Noida installer page describes.

Verde Solaire's other institutional work

The company is ISO 9001:2015 certified and is registered with IOCL, UHBVN, DHBVN, CEL, IPGCL, BRPL and CREST for solar power plant installations. In August 2024 it published that it had installed 350 kW of rooftop solar across 29 schools and 3 colleges in one month under a West Bengal government programme, with 10 kW systems at schools and 20 kW at colleges.

Published institutional projects with their own pages:

How the company approaches schools, colleges and government buyers is on solar for institutions. Every published installation is listed on the projects page.

Questions people ask

Start with a clear plan for your savings

Get a free roof assessment and a written quote for branded equipment. We will also explain the loan, installation, net-metering and subsidy steps.