Skip to content
Verde Solaire

Solar prices and savings in Delhi NCR

For many homes, a 3 kW rooftop system is the point where savings and subsidy work hardest together. Verde Solaire's published price is ₹1,99,000 to ₹2,10,000 before subsidy; the estimated net cost is ₹91,000 to ₹1,02,000 in Uttar Pradesh and ₹43,000 to ₹54,000 in Delhi. Delhi also offers a generation incentive of ₹3 per unit for five years.

These figures give you a useful starting point, not a vague sales promise. Your final written quote follows a site survey and identifies the branded panels, inverter, structure, installation work and paperwork support included in your system.

Find the savings plan for your city

Your electricity board and state incentive affect the process and your final out-of-pocket cost. Select your city to see the savings and paperwork that apply to your roof.

Choose a system size that matches your bill

The central subsidy is ₹30,000 per kW for the first 2 kW and ₹18,000 for the third, capped at ₹78,000. That is why 3 kW is a popular choice, while 5 kW often suits homes with higher usage. Start with your twelve-month average bill, not just your peak summer bill.

What a quality solar quote should make clear

The published ranges include panels, inverter, the mounting structure, net metering, installation and warranty. When you compare quotes, check that each one states:

  1. The panel make, model and wattage, and whether the cells are on the ALMM List-II, which has been mandatory for subsidised systems since 1 June 2026.
  2. The inverter make, model and rating, and its warranty in years.
  3. The structure: material, height above the roof, and the wind rating.
  4. Cabling, earthing and the AC and DC distribution boxes, which some quotes leave out and bill later.
  5. The net-metering application and inspection, including who pays the meter charges. In Delhi there is no application fee for domestic systems up to 10 kW.
  6. GST at about 8.9%: 5% on the panels and inverter (70% of the contract value) and 18% on the rest of the material and installation (30%), shown separately.
  7. What is not included: civil work, load enhancement, a battery.

Verde Solaire's quotes name every component and separate the subsidy, so you can see the amount you pay and what protects that investment. Read how we work to see how we guide you from survey and financing to installation, net metering and subsidy processing.

Plan your solar savingsChoose your city and likely system size to estimate your cost, subsidy, savings, payback and EMI before you request a quote.Open the tool

Questions people ask

Start with a clear plan for your savings

Get a free roof assessment and a written quote for branded equipment. We will also explain the loan, installation, net-metering and subsidy steps.